Lifts in Existing Building Cores
Design studios working on conversions face a constraint that new-build projects avoid: the lift core already exists. In the UK, the Building Safety Regulator’s update for the 12 weeks to 5 October 2026 grouped new higher-risk buildings and conversions together, reporting a 96% approval rate nationally and a 23-week median. As more studios take on office-to-residential and refurbishment projects, working creatively within existing lift shafts has become an essential design skill.
|
What to know
|
The Latest Figures
According to London Construction Magazine’s report on the BSR’s autumn 2026 data, the Building Safety Regulator approved 55 of 57 decisions for new higher-risk buildings and conversions nationally in the 12 weeks to 5 October 2026, a 96% rate covering 11,822 homes, with a 23-week median. In London, 36 of 37 were approved, with a 22-week median.
Overall, 87% of Gateway 2 decisions were approved in the period.
The Existing Core Challenge
Office buildings were designed with lift cores sized for office populations and morning peaks. Converting to homes, hotels or student housing changes demand, but adding new shafts is rarely practical. Studios must work with what exists, upgrading equipment or rethinking how floors are served.
Early analysis shows what is possible.
Testing the Existing Lifts
The first step is to model the existing lift group with its current car sizes, speeds, door times and floors served, then run the proposed population against it. Results show whether service will meet targets for the new use.
AdSimulo offers software that models existing groups and compares upgrade options on the same traffic profile.
Design Options Within the Shaft
Options include replacing cars and doors to increase capacity, upgrading drives for higher speeds, installing modern controllers or zoning lifts to serve different floors. Each affects cost, programme and performance.
Comparing options side by side helps clients choose.
From Analysis to Drawings
Once a solution is chosen, studios need shaft layouts, lobby plans, sections and schedules. Tools that generate these from the same model keep analysis and drawings consistent.
Using design software for lifts that regenerates drawings when the brief changes saves studios significant time.
BIM and the Golden Thread
Exporting the lift group as an IFC model lets studios coordinate it within the wider BIM model and maintain accurate records. For higher-risk buildings, that information supports the golden thread required under the Building Safety Act.
Consistent digital records reduce risk throughout the building’s life.
Readers who want more background can find it in Article Forge Hub’s article on elevator wait times and early design decisions.
Fire and Evacuation Considerations
Conversions may need firefighting or evacuation lifts, protected lobbies and resilient power supplies that the original building did not have. These requirements can affect which existing shafts are used for which purpose.
Early coordination with fire engineers is essential.
Accessibility in Conversions
Existing cars may be too small for modern accessibility expectations. Where shafts allow, larger cars improve access. Clear controls, audible announcements and good lobby lighting help all residents.
Accessibility should shape design from the start.
Communicating With Clients
Clients want to know whether a conversion works and what it costs. Simple summaries of lift performance, options and costs, with visual comparisons, help them decide quickly.
3D visualisation makes technical issues easier to grasp.
Programme Planning
Lift equipment can have long lead times, and installation in existing shafts may reveal surprises. Building contingency into the programme and surveying shafts early reduces delays.
Early decisions protect the overall project timeline.
Lift decisions sit inside much wider development budgets and schedules. Article Orbit’s article on why property managers are moving off spreadsheets looks at how developers are bringing that wider project data together.
Tools for Studios
AdSimulo, based in Woking, Surrey, offers simulation, design drawings and IFC output in one licence from £250 a month, with a five-day evaluation and a 30-minute live demonstration.
Its AdSimulo University resources explain traffic principles and performance criteria.
Lifts in Existing Cores
Converting offices into homes or other uses often means working with existing lift shafts. Their size and position limit the options available, and replacing lifts within the same shaft may still not match the new building’s needs. Early analysis shows whether the existing lifts can serve residents or whether additional capacity is needed.
Design studios that raise these questions early save clients time and money. Discovering a lift problem late in design can force expensive changes to layouts and approvals.
Working With Regulators
Higher-risk building approvals involve detailed scrutiny of safety and access. Clear evidence on lift performance, evacuation and accessibility helps applications move more smoothly. Studios that document these decisions carefully reduce the chance of delays.
Recording each lift decision and the evidence behind it also helps later, when contractors, building control and future owners need to understand why the design took its final shape.
Studios that build this discipline into every conversion project find that approvals, client sign-off and later maintenance all run more smoothly as a result.
The Takeaway
Rising approval rates for conversions in 2026 show that the UK system is processing more higher-risk projects. Design studios that analyse existing lift cores early, compare upgrade options and produce coordinated drawings and BIM models are best placed to deliver successful conversions.
What is the most unusual building your studio has converted?